← The Bellingham Wire
Infrastructure

WSDOT announces multiple roadwork closures for Bellingham area

πŸ”Š Listen Β· narrated by Aiden

Eastbound and westbound traffic on SR 542 will alternate from Kelly Rd to SR 9 starting Oct. 12, 2026, due to roadwork.

Northbound I-5 will have single-lane construction near Alger/Lake Samish Road exit from Oct. 12 to Oct. 16, 2026, for fish passage project.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    WSDOT announces multiple roadwork closures for Bellingham areaβ€œWSDOT highway construction and road closures within 50 miles of Bellingham β€” 10/12/2026:”
  • βœ“
    Eastbound and westbound traffic on SR 542 will alternate from Kelly Rd to SR 9 starting Oct. 12, 2026, due to roadwork.β€œ542 [9 mi from Bellingham]: Eastbound & westbound traffic is alternating on SR 542 from Kelly Rd (MP 8) to SR 9 (MP 10) due to roadwork. Effective: Oct 12, 2026, 7:47 AM”
  • βœ“
    Eastbound and westbound traffic on SR 542 will alternate from Kelly Rd to SR 9 starting Oct. 12, 2026, due to roadwork.β€œ542 [9 mi from Bellingham]: Eastbound & westbound traffic is alternating on SR 542 from Kelly Rd (MP 8) to SR 9 (MP 10) due to roadwork. Effective: Oct 12, 2026, 7:47 AM”
  • βœ“
    Northbound I-5 will have single-lane construction near Alger/Lake Samish Road exit from Oct. 12 to Oct. 16, 2026, for fish passage project.β€œ005 [12 mi from Bellingham]: Northbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Oct. 12, through Friday morning, Oct. 16, near the Alger/Lake Samish Road exit (milepost 240-242) for construction as part of a project correcting 17 barriers to fish migration.”
Source text saved for this check (2026-10-12T18:43:20.696Z)
WSDOT highway construction and road closures within 50 miles of Bellingham β€” 10/12/2026:

542 [9 mi from Bellingham]: Eastbound & westbound traffic is alternating on SR 542 from Kelly Rd (MP 8) to SR 9 (MP 10) due to roadwork.
Effective: Oct 12, 2026, 7:47 AM

544 [10 mi from Bellingham]: From 9 p.m. Wednesday, Oct. 14 to 5 a.m. Thursday, Oct. 15, State Route 544 traffic near Golf View Drive to Raspberry Drive (milepost 2) will alternate with flaggers for utilities work.
Effective: Oct 1, 2026, 3:40 PM
Expected end: Oct 15, 2026, 5:00 AM

005 [12 mi from Bellingham]: Northbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Oct. 12, through Friday morning, Oct. 16, near the Alger/Lake Samish Road exit (milepost 240-242) for construction as part of a project correcting 17 barriers to fish migration.
Effective: Oct 9, 2026, 9:22 AM
Expected end: Oct 16, 2026, 5:00 AM

009 [13 mi from Bellingham]: Northbound & southbound traffic is alternating on SR 9 at Galbraith Rd (MP 72) due to roadwork.
Effective: Oct 12, 2026, 8:38 AM

005 [13 mi from Bellingham]: The northbound I-5 Custer rest area will close from 8 a.m. to 4 p.m. Tuesday, Oct. 13, for maintenance work. Other rest areas are available on the WSDOT website.
Effective: Oct 9, 2026, 9:56 AM
Expected end: Oct 13, 2026, 4:00 PM

020 [22 mi from Bellingham]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed.

Construction of a new roundabout at the intersection will resume in spring 2027.
Effective: Sep 4, 2026, 8:25 AM

536 [24 mi from Bellingham]: Expect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.
 
More on project webpage.
Effective: Oct 7, 2026, 8:54 AM

536 [24 mi from Bellingham]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.

The bridge remains open to westbound traffic. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.

More information on project webpage
Effective: Jun 5, 2026, 9:06 AM

The Bellingham Wire is free. Get Bellingham's news delivered every morning.