← The Bellingham Wire
Infrastructure

SR 542 alternate traffic daily for utility work

πŸ”Š Listen Β· narrated by Aiden

Eastbound and westbound SR 542 will alternate from 8 a.m. to 2:30 p.m. daily Monday through Thursday, Oct. 12-15 between Dewey Road (milepost 3) and Casey Road (milepost 23) for utility work. The closure is effective Oct. 12, 2026, at 8:10 a.m. and expected to end Oct. 15, 2026, at 2:30 p.m.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    SR 542 alternate traffic daily for utility workβ€œ542 [4 mi from Bellingham]: Eastbound and westbound SR 542 will alternate from 8 a.m. to 2:30 p.m. daily Monday through Thursday, Oct. 12-15 between Dewey Road (milepost 3) and Casey Road (milepost 23) for utility work.”
  • βœ“
    State Route 542 will alternate traffic Monday through Thursday for utility work between Dewey Road and Casey Road, ending Oct. 15.β€œ542 [4 mi from Bellingham]: Eastbound and westbound SR 542 will alternate from 8 a.m. to 2:30 p.m. daily Monday through Thursday, Oct. 12-15 between Dewey Road (milepost 3) and Casey Road (milepost 23) for utility work.”
  • βœ“
    Eastbound and westbound SR 542 will alternate from 8 a.m. to 2:30 p.m. daily Monday through Thursday, Oct. 12-15 between Dewey Road (milepost 3) and Casey Road (milepost 23) for utility work. The closure is effective Oct. 12, 2026, at 8:10 a.m. and expected to end Oct. 15, 2026, at 2:30 p.m.β€œ542 [4 mi from Bellingham]: Eastbound and westbound SR 542 will alternate from 8 a.m. to 2:30 p.m. daily Monday through Thursday, Oct. 12-15 between Dewey Road (milepost 3) and Casey Road (milepost 23) for utility work.”
Source text saved for this check (2026-10-13T12:41:19.395Z)
WSDOT highway construction and road closures within 50 miles of Bellingham β€” 10/13/2026:

542 [4 mi from Bellingham]: Eastbound and westbound SR 542 will alternate from 8 a.m. to 2:30 p.m. daily Monday through Thursday, Oct. 12-15 between Dewey Road (milepost 3) and Casey Road (milepost 23) for utility work.
Effective: Oct 12, 2026, 8:10 AM
Expected end: Oct 15, 2026, 2:30 PM

544 [10 mi from Bellingham]: From 9 p.m. Wednesday, Oct. 14 to 5 a.m. Thursday, Oct. 15, State Route 544 traffic near Golf View Drive to Raspberry Drive (milepost 2) will alternate with flaggers for utilities work.
Effective: Oct 1, 2026, 3:40 PM
Expected end: Oct 15, 2026, 5:00 AM

542 [11 mi from Bellingham]: Daily from 8 a.m. to 2:30 p.m. beginning Monday, Oct. 5 to 2:30 p.m. Friday, Oct. 16, State Route 542 traffic from Finsrud Road (milepost 11) to James Road (milepost 17) will alternate with flaggers for utilities work.
Effective: Oct 1, 2026, 3:50 PM
Expected end: Oct 16, 2026, 2:30 PM

005 [12 mi from Bellingham]: Northbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Oct. 12, through Friday morning, Oct. 16, near the Alger/Lake Samish Road exit (milepost 240-242) for construction as part of a project correcting 17 barriers to fish migration.
Effective: Oct 9, 2026, 9:22 AM
Expected end: Oct 16, 2026, 5:00 AM

005 [13 mi from Bellingham]: The northbound I-5 Custer rest area will close from 8 a.m. to 4 p.m. Tuesday, Oct. 13, for maintenance work. Other rest areas are available on the WSDOT website.
Effective: Oct 9, 2026, 9:56 AM
Expected end: Oct 13, 2026, 4:00 PM

020 [22 mi from Bellingham]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed.

Construction of a new roundabout at the intersection will resume in spring 2027.
Effective: Sep 4, 2026, 8:25 AM

536 [24 mi from Bellingham]: Expect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.
 
More on project webpage.
Effective: Oct 7, 2026, 8:54 AM

536 [24 mi from Bellingham]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.

The bridge remains open to westbound traffic. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.

More information on project webpage
Effective: Jun 5, 2026, 9:06 AM

The Bellingham Wire is free. Get Bellingham's news delivered every morning.